Hammersmith & Fulham Town Hall (WKSR)

Contract value: £2,000,000

Number of units: 204

Developer: London Borough Hammersmith & Fulham

Project Summary

Fulham & Hammersmith Town Hall, West King Street, W6 9JU

This prestigious mixed-use development, managed by Ardmore, is located at Fulham & Hammersmith Town Hall, West King Street, London, W6 9JU. The project forms part of a major regeneration of the historic Town Hall and surrounding area, delivering a blend of private, rented, and shared ownership homes, alongside commercial and community spaces. The residential component comprises Block A with 121 Private, Rented, and Shared Ownership units, Block C providing 47 Rented units, and Block D offering 36 Private and Shared Ownership units. Block B and the Town Hall itself are dedicated to communal, public, and performance areas.

The flooring package includes the supply and installation of a wide range of high-quality and specialist products suited to both residential and civic environments. Key finishes include Durafloor Momenta II Toffee Oak, Pergo L0231-03374 Coastal Oak Plank Beige, and Forbo Novilon Viva Cool Wood 5788 for contemporary living spaces; Cormar Primo Plus Alloy Grey and Eaton Square Rome Sea Mist for bedrooms; and Cavalier Cartouche Cut Pile Tufted Velour Ash Grey for premium areas. Communal and public spaces feature Heckmondwike Supacord Sheet, Interface On Line FL-601 Granite and FL-602 Cloud carpet tiles, and specialist matting systems including Duraflor Entraguard Anthracite Infills, Intramatting Intrashape 16mm, and Intrasystems Intraflow Plus.

For performance and heritage spaces, Dinesen European White Oak, Havwoods Engineered European Oak Herringbone HW16006, Havwoods BP7870, Harlequin Woodspring Sprung Floor, Nora Norament 926 0007, and Penny Dot Rubber Sheet have been specified to deliver exceptional quality, durability, and aesthetic appeal. All stair areas are complemented by Morleys HN1 Nosings to ensure safety and regulatory compliance.

The project is programmed over a 32-month duration, with meticulous coordination required across the live, heritage, and new-build elements to achieve outstanding results and uphold the highest standards of craftsmanship throughout